New Space Missions and Developments

  • 28 Oct 2024

In News:

The Space Commission also approved a joint moon mission with Japan called the Lunar Polar Exploration Mission. For LUPEX, ISRO is developing a different moon lander than the one it used for Chandrayaan-3

New Space Missions and Developments

  • Chandrayaan-4 (Moon Mission):
    • Type: Sample-return mission.
    • Launch: Expected by 2027.
    • Cost: ?2,104 crore.
    • Objective: Sample collection of moon soil and rock to return to Earth.
    • Mission Details: Two LVM-3 launch vehicles will launch components that will dock in Earth orbit before heading to the moon. The samples will be sent back using a bespoke canister.
  • Lunar Polar Exploration Mission (LUPEX):
    • Collaboration: Joint mission with Japan.
    • Objective: Exploration of lunar poles with a new lander design, intended for potential crewed missions in future.
  • Venus Orbiter Mission:
    • Launch Window: March 2028.
    • Cost: ?1,236 crore.
    • Objective: Study Venus' surface and atmosphere to understand planetary evolution in the Solar System.
  • Next Generation Launch Vehicle (NGLV):
    • Development Budget: ?8,240 crore for first three development flights.
    • Objective: A new launcher developed with private sector collaboration for future space missions.

Cabinet Approvals for Space Initiatives

  • Human Spaceflight Programme (Gaganyaan):
    • Four new missions under Gaganyaan, including an uncrewed Gaganyaan flight.
    • Focus on developing technologies for India’s first space station, Bharatiya Antariksh Station (BAS), planned by 2028.
  • Space-Based Surveillance (SBS) Missions:
    • Phase 3: Approval for building 21 ISRO satellites, with 31 additional satellites by private companies.
    • Total Cost: ?26,968 crore.
  • Development of a Third Launch Pad:
    • To support the NGLV and additional space missions at Sriharikota.

Upcoming Satellite Missions

  • NISAR (NASA-ISRO Synthetic Aperture Radar):
    • Launch: Early 2025 on a GSAT launch vehicle.
    • Purpose: Earth observation using advanced radar technology.
    • Issue: Protective coating added due to high temperatures during testing.
  • Proba-3 (European Space Agency):
    • Launch: November 29, 2024, aboard PSLV-XL.
    • Objective: Study the Sun’s corona using two satellites in formation, mimicking an eclipse to capture unique solar data.

Private Sector Involvement

  • Manastu Space & Dhruva Space:
    • Collaboration: Testing green propulsion technology for the LEAP-3 mission.
    • Technology: Hydrogen-peroxide-based green propulsion system.
    • Launch: LEAP-3 mission in 2025.
  • Bellatrix Aerospace:
    • Project: Prototype satellite for ultra-low earth orbit at 200 km altitude.
  • Ananth Technologies:
    • Achievement: First private company to assemble, integrate, and test Space Docking Experiment (SpaDEx) satellites for ISRO.

Space Science and Research Updates

  • Chandrayaan-3:
    • Findings: The crater where Chandrayaan-3 landed is older than the South Pole-Aitken Basin (4.2-4.3 billion years old).
    • Data Source: Optical High-Resolution Camera (Chandrayaan-2) and Pragyaan rover (Chandrayaan-3).
  • Astrosat (India’s First Space Observatory):
    • Mission Life: Expected to last two more years (originally planned for 5 years).
    • Significance: Contributed to over 400 published papers based on multi-wavelength space observatory data.

Chandrayaan-3 Propulsion Module Retraces Steps to Earth Orbit (Indian Express)

  • 07 Dec 2023

Why is it in the News?

Scientists have brought the Propulsion Module (PM) of the Chandrayaan-3 mission , which initially brought the Vikram lander to within 100 km of the Moon's surface before detaching and executing a historic controlled descent on August 23, back into Earth orbit.

What is a Propulsion Module in Chandrayaan-3?

  • The Propulsion Module is a rectangular component of the Chandrayaan-3 spacecraft, equipped with solar panels for power.
  • Its primary purpose was to transport the Lander module to the lunar polar circular orbit and facilitate its separation.
  • Following separation, the SHAPE payload within the Propulsion Module was activated.
  • Initially intended for a three-month operation during the mission, the ISRO announced on December 4th that the Chandrayaan-3's Propulsion Module had been manoeuvred out of lunar orbit.
  • Placed high above Earth for an additional mission, the module is currently sustained by residual fuel.
  • This bonus mission will showcase technologies crucial for future lunar sample retrieval, according to ISRO.
  • As of now, the ISRO has not disclosed its plans for the spacecraft once it depletes its fuel.

Importance of Propulsion Module's Return to Earth's Orbit:

  • ISRO highlighted the key achievements resulting from the return manoeuvres conducted on the Propulsion Module (PM) in connection to upcoming missions:
  • Planning and executing the trajectory and manoeuvres for the return journey from the Moon to Earth.
  • Developing a software module for planning such manoeuvres, along with its initial validation.
  • Planning and executing a gravity-assisted flyby around a planet or celestial body.
  • Preventing uncontrolled crashing of the PM onto the Moon's surface at the end of its life, aligning with the requirement of avoiding debris creation.

What is Chandrayaan-3 Mission?

TransLunar Injection (TLI) (The Hindu)

  • 02 Aug 2023

Why in the News?

The TransLunar Injection (TLI) was performed successfully from ISRO Telemetry, Tracking and Command Network (ISTRAC) in Bengaluru recently.

What is the TransLunar Injection (TLI)?

  • TransLunar Injection (TLI) is a crucial space mission maneuver, propelling spacecraft from Earth's orbit to a trajectory aimed at reaching the Moon.
  • An essential step in lunar missions, TLI allows spacecraft to break free from Earth's gravity and commence their journey toward the Moon.
  • TLI is executed when the spacecraft reaches the perigee, the closest point to Earth in its orbit.
  • During TLI, the spacecraft's propulsion system ignites its engines, accelerating the craft and providing the necessary speed to escape Earth's gravitational pull.
  • The thrust and duration of the TLI burn are determined by factors like spacecraft mass, Earth's orbital velocity, and specific mission objectives.
  • Following a successful TLI, the spacecraft is directed onto a lunar trajectory, continuing its autonomous journey to the Moon without further reliance on Earth's propulsion.
  • Subsequent to TLI, the spacecraft enters a transfer orbit, an elliptical path that intersects with the Moon's orbit.
  • The spacecraft traverses this highly eccentric orbit until it reaches the lunar surface.
  • As the spacecraft approaches the Moon, additional maneuvers like lunar orbit insertion (LOI) may be executed to enter lunar orbit or facilitate landing, based on the mission's objectives.
  • TLI has been effectively utilized in numerous Moon missions, including Apollo, Chang'e, and Artemis missions.